USDA Design/Build Perimeter Security Enhancement Parking Lot 9

USDA, OCP-POD-ACQ-MGMT-BRANCH-FTC

Respond by

January 6, 2027

Type

Combined Synopsis/Solicitation

Reserved for

No Set aside used

Industry

237310

Highway, Street, and Bridge Construction

USDA, OCP-POD-ACQ-MGMT-BRANCH-FTC posted this combined synopsis/solicitation on November 19, 2026, with responses due January 6, 2027. It is set aside: No Set aside used. It falls under highway, street, and bridge construction (NAICS 237310), with the work in District of Columbia. Federal agencies award about 3 contracts like this a year in District of Columbia, worth roughly $7.5M.

What this kind of notice means

This is a live request for quotes or proposals, usually for a commercial product or service, with everything you need in one notice. Responses are due by the date shown.

This kind of work, from this buyer

What this contract means for you

๐Ÿ”’ Read this contract in plain English

What they need ยท Can you bid ยท Who usually wins ยท Who to contact

See it free

Common questions

When is "USDA Design/Build Perimeter Security Enhancement Parking Lot 9" due?
Responses are due January 6, 2027. Check the notice on SAM.gov for the time and time zone, and send a day early.
Who can bid on "USDA Design/Build Perimeter Security Enhancement Parking Lot 9"?
It is set aside (No Set aside used), and bidders must be registered in SAM.gov and fit the small-business size limit for NAICS 237310.
What does a combined synopsis/solicitation mean?
This is a live request for quotes or proposals, usually for a commercial product or service, with everything you need in one notice. Responses are due by the date shown.

Is this one worth your time?

See if you qualify, what it usually sells for, and who you're up against.

Check it free