The real requirements of a federal contract usually sit in the attachments, not in the notice you read on SAM.gov. The notice is a cover note. The attachments hold the work description, the wage rates you must pay, the forms you must sign, the price sheet and the rules for how you'll be scored. Read them in the right order and you can decide in 20 minutes whether a bid is worth your week.
This guide walks through each kind of attachment you'll meet, what to look for in it, and the order that gets you to a bid / no-bid decision fastest.
Why the attachments matter more than the notice
A SAM.gov notice gives you a title, a deadline, a set-aside and a few paragraphs. That's enough to decide whether to open the files, and not enough to bid. Agencies attach the documents that actually become the contract.
In a formal solicitation, the federal rules even give the attachments a place. The Uniform Contract Format splits a solicitation into sections A to M, and Section J is simply the list of attachments. So when Section C says "see Attachment 1," the work is defined there, not on the page in front of you.
Two habits save the most trouble:
- Download every file, including the ones with dull names like "Attachment 7". Questionnaires and certification forms are often the ones that get a bid thrown out.
- Check the notice history for amendments before you finish. A later amendment can replace an attachment completely.
The main solicitation file
This is the file named something like "Solicitation", "RFQ" or "SF1449". Read it first, even though it's often the longest, because it tells you how everything else fits together.
What it is. For commercial buys, agencies use Standard Form 1449, a cover form followed by pages of instructions, clauses and an evaluation section. For larger formal buys, you'll see the A-to-M layout instead.
What to find in it:
- The due date and time, with the time zone. It's often in a box on the cover form, not in the text. Note how to submit (email, an agency portal, or a named system) and where.
- The instructions to offerors. In the A-to-M layout this is Section L: how many volumes, page limits, fonts, file formats, what goes in each part. On a commercial buy it's an addendum to the standard instructions.
- How you'll be scored. This is Section M (or the evaluation addendum). It tells you whether the agency picks the lowest price that's acceptable or trades price against quality, and which factors count most. Our guide to Sections L and M goes deeper.
- The question deadline. Usually well before the due date. Miss it and you're bidding on your own guesses.
The PWS or SOW: what the work actually is
This is the heart of the bid, and the attachment most worth reading slowly.
SOW (statement of work) describes the work, often in terms of the tasks and methods the agency wants.
PWS (performance work statement) describes the results the agency needs. Under FAR 37.602, a PWS should define the work by results rather than by methods or hours, and those results should be measurable against standards. In practice that means you'll see a table near the end with performance objectives, standards ("100% of work orders closed within 5 days") and acceptable quality levels.
What to look for:
- Place and hours. Where the work happens, on what days and times, and whether staff must be on site.
- Staffing rules. Named key personnel, required certifications, licenses, minimum years of experience, background checks or clearances.
- Deliverables and deadlines. Reports, plans due within X days of award, phase-in periods.
- Government-furnished items. What the agency provides (space, equipment, materials) and what you must bring.
- The performance standards table. This is how you'll be judged after award, and agencies often check against it in a quality plan (a QASP, under FAR 37.604).
A quick test: if you can't picture your team doing every task in the PWS next month, stop here. That's a no-bid or a teaming conversation, not a proposal.
Wage determinations: the price floor nobody tells you about
If the contract is for services, you'll often find an attachment named "WD" followed by a number. This is a wage determination: the minimum hourly wages and fringe benefits the U.S. Department of Labor sets for each job title in that area.
Under FAR 22.1002-1, service contracts over $2,500 must include the minimum wage and fringe benefit rules. For construction, the equivalent is the Davis-Bacon wage decision.
Why it matters for you:
- It sets your floor. You must pay at least these rates to the workers on the contract, plus the listed fringe benefits (health and welfare, holidays, vacation). If your normal rates are below them, your price goes up.
- It's specific to the location and the job titles. A janitor in one county can have a different rate than in the next.
- Build your price from it. Map each role in the PWS to a job title on the wage determination, then add your payroll taxes, insurance, overhead and profit. Our pricing guide walks through it.
Price schedules and spreadsheets
The price sheet is usually an Excel file: a list of line items (often called CLINs) with quantities and blank price columns. Some agencies put it inside the solicitation as Section B instead.
What to check:
- Every line must be filled in. A blank line can make a bid unacceptable. Read the instructions for lines that say "not separately priced".
- Option years. Many contracts run a base year plus option years. You price them all now.
- Units. Monthly, each, per hour, lot. A wrong unit is a common and expensive mistake.
Treat this file as the last thing you fill in, after you understand the work and the wage floor.
Forms, certifications and questionnaires
These are the dull files that sink bids.
- Past performance questionnaires. Some agencies want you to send a form to your past clients, who send it straight to the contracting officer by a deadline. Start this early, because you don't control the timing.
- Company experience forms. A fixed template for describing similar jobs. Use their template, not your own.
- Self-certifications. For example, statements about telecommunications equipment or other required representations. Many of these come from your SAM.gov registration, but some bids ask for a signed copy.
- Amendments. An amendment usually comes with a form (Standard Form 30) and asks you to acknowledge it. Failing to acknowledge an amendment can make your bid unacceptable, so list every amendment number in your submission.
Drawings, specifications and controlled files
Product buys and construction often attach drawings, technical specifications or standards.
- Drawings and specs define exactly what you must supply. Check materials, tolerances, testing and packaging rules.
- Controlled files. Some attachments on SAM.gov are marked controlled and can't be downloaded by just anyone. You need a SAM.gov login and the agency's approval. If a bid's key drawings are controlled, request access on the first day, because approval can take time.
The order to read them (the 20-minute version)
When a new notice lands, this order gets you to a decision fastest:
1. The notice itself: set-aside, deadline, place. Rule out what you can't bid on.
2. The PWS or SOW: can you do every task? Look hard at staffing rules and certifications.
3. The evaluation section: lowest price, or a trade-off? Which factors weigh most?
4. The submission instructions: page limits, volumes, due date and time zone, question deadline.
5. The wage determination: does the floor still leave you a margin?
6. Forms and questionnaires: anything with a lead time, like past-client questionnaires.
7. The price schedule: last, once you know your costs.
If steps 2 to 5 all look good, read everything start to finish before you write a word. Then build a compliance matrix so every "shall" has an answer.
Common mistakes with attachments
- Reading only the notice. It rarely has the full requirements.
- Missing an amendment. Check the notice page again the day before you submit.
- Pricing before reading the wage determination. You'll either lose money or lose the bid.
- Ignoring the questionnaires until the last week. Past clients take time to respond.
- Using your own format when they gave a template. Evaluators score what's easy to check.
- Skipping scanned files. A scanned page has no searchable text, so a keyword search finds nothing. Read scans by eye.
FAQ
What is Section J in a solicitation?
Section J is the list of attachments in the standard federal solicitation format. It names each attached document, such as the performance work statement, wage determination, forms and exhibits. The attachments themselves are separate files on the SAM.gov notice.
What's the difference between a PWS and a SOW?
A SOW usually describes tasks and how to do them. A PWS describes the results the agency needs, with measurable standards, and leaves more of the method to you. Both define the work you'll be held to.
Do I have to pay the wages in the wage determination?
Yes, for workers on a covered service contract. The rates and fringe benefits listed are minimums for each job title in that location. Build them into your price from the start.
Where do I find a solicitation's attachments?
On the notice page on SAM.gov, under the attachments or links section. Most can be downloaded without an account. Controlled files need a SAM.gov login and approval from the agency.
How long should it take to read the attachments?
A quick read to decide whether to bid can take 20 to 30 minutes. A full read before writing, for a large bid with several attachments, can take a day. Starting with the work statement and the evaluation section saves the most time.
Can software read the attachments for me?
It can get you to a checklist faster, but it doesn't replace reading. AskTuvo's Solicitation Reader opens every PDF and Word attachment on a federal notice and lists the must-haves, submission rules and scoring rules, each with its file and page, so you can check them yourself.